Drafted. Fabricated. Installed.
From 2D CAD shop drawings to precision Stainless, Aluminium & Carbon Steel fabrication and ticketed on-site rigging & contracting across Cornubia, Logan, Redland Bay, Brisbane, and the Gold Coast.
The Trade Triple-Threat
We measure on-site and draft clear 2D CAD fabrication drawings for RPZD cages, stair stringers, posts, brackets, and structural layouts before cutting a single piece of steel.
Advanced welding across Stainless Steel, Aluminium, and Carbon/Mild Steel—structural posts, beams, curved stairs, handrails, pipework, IBEX crimping, roller gates & security cages.
Licensed Dogman (DG), Basic Rigger (RB), Forklift (LF), Confined Space & Working at Heights. Cranage, steel erection, fuel system installs, site prep & skilled trade labour.
What We Design, Weld & Build
1. Structural Steel & Stairs →
Engineered structural building steel fabricated with heavy pre-drilled baseplates, cleats, and offset connections.
- Structural Posts, Beams & Columns
- Internal & External Stair Stringers (Curved & Straight)
- Handrails, Railings & Balustrades
- Deck Posts & Shade Sail Posts
2. Pipework, Fuel & Welding →
High-purity TIG, MIG, and Stick welding for commercial fluid transfer, aviation/retail fuel systems, and plant upgrades.
- Stainless Steel Flanged Pipe Welding
- IBEX Pipe Crimping & Press-Fit Systems
- Commercial Fuel Tanks, Pipework & Stands
- Stainless, Aluminium & Carbon Steel Welding
3. Cages, Gates & Custom Fab →
Custom commercial protection cages, property access gates, hospitality frames, and workshop storage built to last.
- RPZD Backflow & Plumber Pipework Cages
- Sliding Roller Gates, Swing Gates & Doors
- Custom Cabinets, Racking & Pipe Stands
- Cafe Barricades & Custom Metal Signage Frames
From 2D CAD Drawing to Installed Commercial Steel
2D CAD Drafting Before We Cut Steel
Detailed 750x740x180mm isometric CAD drawing specifying 25x25x3mm angle frame, 50x50mm welded mesh, concealed internal hinges, padlock hasp, and compliance drainage clearances.
Precision Fit Over Live Plumbing Pipework
The finished hot-dip galvanized cage bolted directly to the blockwork wall—clearing the copper main risers and bottom PVC tundish drain on the first install.